Tested. Proven. Reliable. Made by Morgan.
ARCHITECTURAL SPECIFICATIONS |
|
FireMaster FastWrap XL and Pyroscat Duct Wrap XL Short Specification |
|
FireMaster FastWrap XL Grease Duct Specification Detail (AutoCAD) |
|
UL LISTINGS |
|
HNKT.G-18 for 2-hour Rated Grease Duct Enclosures per ASTM E2336 |
|
HNLJ.V-19 for 2-hour Rated HVAC Duct Enclosures per ISO-6944 |
|
HNLJ.V-2 for 3-hour Rated HVAC Duct Enclosures per ISO-6944 |
|
HNLJ.V-29 for 1-hour Rated Dryer Duct Enclosures per ISO-6944 |
|
HNKNC.FRD-3 for 2-hour Rated HVAC Duct Enclosures |
|
HNKNC.FRD-4 for 2-hour Rated Grease Duct Enclosures |
|
HNKNC.FRD-5 for 2- and 3-Sided Installation of HVAC Ducts |
|
HNKNC.FRD-6 for 2-hour Rated HVAC Duct Enclosures |
|
HNKNC.FRD-7 for 2-hour Rated Grease Duct Enclosures |
|
HNKNC.FRD-18 for 2-hour Rated HVAC Duct Enclosures |
|
HNKNC.FRD-28 for 1-hour Rated Dryer Duct Enclosures |
|
FHIT.5 for 1-hour Electrical Circuit Integrity of Cable Trays and Conduit |
|
BKNV.R14229 for Surface-burning characteristics and Non-combustibility Certificate for faced and unfaced blankets |
|
BKNV7.R14229 for Surface burning characteristics to CAN/ULC-S102 and Non-combustibility to CAN/ULC-S114 for unfaced blanket |
|
C-AJ-7012 (HVAC Ducts – Wrap Through the Assembly) |
|
C-AJ-7014 (HVAC Ducts – Wrap Through the Assembly) |
|
C-AJ-7019 (HVAC Ducts – Terminate at the Assembly) |
|
C-AJ-7021 (Grease Ducts – Wrap Through the Assembly) |
|
C-AJ-7095 (HVAC Ducts – Wrap Through the Assembly) |
|
C-AJ-7098 (Grease Ducts – Wrap Through the Assembly) |
|
C-AJ-7150 (HVAC Ducts – Wrap Through the Assembly) |
|
C-AJ-7152 (HVAC Ducts -Terminate at the Assembly) |
|
C-AJ-7153 Grease Ducts – Terminate at the Assembly) |
|
F-C-7036 (HVAC/Grease Ducts – Wrap through a Floor/Ceiling Assembly) |
|
W-L-7121 (HVAC/Grease Ducts – Wrap Through Gypsum Wall) |
|
W-L-7145 (HVAC Ducts - Wrap Through Gypsum Wall) |
|
W-J-7086 (HVAC Ducts – Wrap Through Concrete Wall) |
|
INTERTEK LISTINGS |
|
TC/FRD 120-19 for flame & smoke protection of plastic pipe in a plenum |
|
TC/FRD 120-20 for flame & smoke protection of plastic-coated electrical cables in a plenum |
|
TC/BI 120-02 for 2-hour Rated HVAC Duct Enclosures per ASTM E2816 Conditions A & B |
|
TC/BI 120-03 for 2-hour Rated HVAC Duct Enclosures per ASTM E2816 Conditions C & D |
|
TC/BI 120-04 for 2-hour Rated Grease Duct Enclosures per ASTM E2336 |
|
TC/BI 120-05 for 2-hour Rated Grease Duct Enclosures per CAN/ULC-S144 |
|
TC/BI 120-06 for Through Penetration Firestops for Grease Ducts per ASTM E814 and CAN/ULC-S115 |
|
TC/BI 120-07 for Through Penetration Firestops for Grease Ducts per ASTM E814 and CAN/ULC-S115 |
|
TC/BI 180-01 for 3-hour Rated HVAC Duct Enclosures per ASTM E2816 Condition B |
|
FACTORY MUTUAL LISTING |
|
No. 3973 for 30-minute Protection of Cables & Cablet Trays when exposed to a hydrocarbon fire |
|
BUILDING CODE COMPLIANCE REPORTS |
|
Intertek Code Compliance Research Report CCRR-0402 – FireMaster FastWrap XL, Pyroscat Duct Wrap XL, & FireMaster FastWrap XLS evaluation with IBC & IMC for use in Grease Ducts. |
|
UL Evaluation Report UL ER14229-01 – FireMaster FastWrap XL & Pyroscat Duct Wrap XL evaluation with IMC, IBC, IAPMO UMC, & NFPA 96 for use in Grease Ducts |
|
City of Los Angeles Dept. of Building and Safety Research Report No. 26067-T for Fire Resistive Ventilation Ducts |
|
City of Los Angeles Dept. of Building and Safety Research Report No. 26067 (CSI# 23 07 00) for FireMaster FastWrap XLS Fire Resistive Ventilation Ducts |
|
California State Fire Marshal Listing No.2440-1361:0106 |
|
PROJECT CASE HISTORIES |
|
Hollywood Station Residences |
|
Wynn Hotel |
|
Project Reference List |